The project Stuttgart 21 is a traffic and urban development project for the reorganization of the railway junction Stuttgart. For this a BRUNNHUBER double-girder gantry crane was used for transportation of soil, which was within the scope of modernisation works equipped with a higher load capacity and a higher hoist speed.